丁香婷婷六月激情基地,美国一级美国一级欧美三级,自拍偷区亚洲综合图片,2025最新最全的国产a,国语自产视频在线播放,国产盗摄TP摄像头偷窥真实

歡迎進(jìn)入美莎防水 上海榮拓實(shí)業(yè)有限公司
加入收藏聯(lián)系我們
全國服務(wù)熱線:021 - 6811 1319
廠房維修

冬天屋頂防水施工對(duì)溫度的要求

標(biāo)簽:冬天,屋頂,防水,施工,溫度,要求 時(shí)間:2025年06月05日 閱讀435

1、氣溫:最好在5℃以上施工,溫度太低容易冷凝,不利涂膜的干燥,且會(huì)出現(xiàn)裂紋、水泡等情況;
1, the temperature: the best in the construction of more than 5 degrees Celsius, the temperature is too low easy to condensation, unfavorable film drying, and there will be cracks, blisters, etc.;


2、不能再結(jié)冰或上霜的基面上施工,也不要在低于4℃時(shí)使用。確實(shí)因工期必要必須施工時(shí),可將施工時(shí)間安排在晴天好氣候的10:0-15:00之間,延續(xù)環(huán)境溫度低于零下4℃時(shí),建議停息施工;

2, can not freeze or frost on the surface of the construction, do not contact the environment within 48 hours when the temperature is less than 4 degrees. Indeed, because of the need for the construction period, the construction time can be arranged in a sunny weather 10:0-15:00,When the ambient temperature is below 4 degrees below zero, it is recommended to suspend construction;


3、不宜在雨雪天施工,新施工的外觀固化前不要被雨淋。施工后48小時(shí)內(nèi)(百度搜索引擎優(yōu)化),仍應(yīng)避免雨淋、霜凍貨0℃以下的長期低溫;在空氣流通不良或不具備透風(fēng)條件的情況下(如封閉的礦井或隧道),可采用風(fēng)扇或鼓風(fēng)機(jī)幫忙透風(fēng)。
3, not in the rain and snow surface construction, new construction is not cured before the rain. Within 48 hours after construction, should avoid long-term low temperature rain and frost goods 0 DEG C; in the case of poor air circulation or do not have ventilation conditions (such as closed mine or tunnel), can be used to assist the ventilation fan or blower.