一、總要求:
First, the total requirements:
1、以排為主,以防為輔。
1、mainly in order to prevent the supplement.
2、屋頂防水層須做在樓地面面層下面。
2、waterproof layer must be done in the floor below the floor surface.
3、衛(wèi)間地面標(biāo)高,應(yīng)低于門外埠面標(biāo)高,低漏標(biāo)高則更低。
3、the ground elevation of the guardian, should be lower than the ground floor elevation, lower leakage elevation is lower.
二、 排水坡度要求:北京專業(yè)做屋頂防水
Two, drainage slope requirements: Beijing professional do waterproof
1、地面向地漏處排水坡度一樣平常為2%.
1, the ground floor drain to drainage slope 2%.
2、低漏處排水坡度,以地漏邊緣向外50mm,排水坡度為3-5%.
2、low drain drainage slope to drain edge outward 50mm drainage slope 3-5%.
3、地漏標(biāo)高應(yīng)根據(jù)門口至地漏的坡度確定,需要時(shí)設(shè)門檻。
3、 floor elevation shall be determined according to the gate to drain the slope, if necessary, set the threshold.
4、廚衛(wèi)間如設(shè)有浴盆建網(wǎng)站費(fèi)用,浴盆地面排水至地漏坡度為3-5%.
4、kitchen as a bathtub, bathtub floor drain to the floor drain slope 3-5%.
三、找平層要求:
Three, the leveling layer requirements:
1、10-20mm厚1:2.5水泥砂漿找平層,抹平壓光,套管根部抹成“八”字角建網(wǎng)站多少錢,寬10mm、高15mm,陰陽(yáng)角抹成小圓角,收頭應(yīng)光滑油滑。
1、10-20mm thick 1:2.5 cement mortar leveling layer, smooth light pressure, casing root put into "eight" angle, width 10mm, high 15mm, yin and yang angle put into small round, head should be smooth.
2、對(duì)高低不平部位或凹坑處,用1:2.5的水泥砂漿抹平。
2、the uneven parts or pits, with 1:2.5 cement mortar.